How to move a steel building
Depending on the size and design of the steel building, there are two options for moving it. Larger steel buildings sealed to a foundation will need to be dismantled and reassembled, while smaller steel buildings may be able to be moved short distances. in one whole. Either way, moving a steel building 50 feet or 500 miles requires an elevator, and a skilled elevator; if moving a significant distance, an 18-wheeler will be required.
It is possible to move smaller steel buildings such as sheds or small garages without disassembling them. If a smaller building is moved a short distance, say from one end of a property to another, it can actually be dragged. The process begins by carefully lifting the front of the steel building with a lift and sliding a piece of wood under it to act as a stand and then repeating this process again on the back of the building. Then, by attaching a tow rope to the tree below the building, the steel structure can be towed from one location to another.
Although this method is much cheaper than disassembly and reassembly, it is also riskier. Uneven movement can cause bending and warping that can damage or destroy the structural integrity of a steel building. A recommended, but not foolproof, method of preventing bowing is to reinforce the runners by attaching a 2×4 cut to the width of the building to the runners, creating a sort of frame. Eventually, the building can be towed on skids by a truck; like a child dragged through the snow on a sled by his parents.
If the building needs to be moved further, then it can be lifted with the lift from 2 until a truck can drive under it, at which point the lift can lower the steel building or canopy onto the bed of the truck. The truck can then move the building and then raise and lower the steel building onto its new property again.
Moving a larger building is much more complicated because it involves breaking a building down into its basic components, transporting the components, and then reassembling them. The most important part of demolishing a building is organization. Improper deconstruction can lead to expensive costs in the form of lost or damaged parts. It is strongly recommended that skilled workers be employed to ensure that the structural integrity of the steel building is protected throughout all phases of the moving process.
Demolition of a building is essentially done in the reverse order of its construction. Remove the trim and accessories, then the roof and wall covering, then the frame. At the new location, a new foundation will need to be prepared with the appropriate anchor bolts. Once all the components have been moved from the original location to the new location, the reconstruction process can begin as if it were a brand new building. High-quality buildings will be easier to move because their components will be better able to withstand the wear and tear of disassembly and reassembly. Also, pre-welded brackets on the buildings will speed up the whole process and prevent loose bolted brackets from being lost during the move.